GigaBase – AI Data Center System

Build your AI data center in 9 months.

GigaBase is our pre-engineered, vertically integrated data center system that helps AI operators deploy compute capacity faster.

To Energization
9 months
Deployment
Scales WITH
8.4 MW IT
BUILDING BLOCKS
Field Labor
90% reduction
vs. Industry Norm

what is GigaBase?

The GigaBase,
module by module.

DISTRIBUTED REDUNDANCY

Four independent power trains supply every AI pod. If any one train fails, the other three carry the full load.

  • 01
    GigaPod
    AI-01

    45-foot AI compute module with hot aisle containment, air-to-liquid cooling, and 4N3 redundant power.

    GigaPod supports high-density liquid-cooled and low-density air-cooled racks and scales to 90 or 135 feet.

  • 02
    MV Switchgear
    M-01

    24.9kV or 35kV medium voltage module connecting and distributing power from the utility to the site with 2 incoming feeders and 10 feeder breakers.

  • 03
    UPS E-House
    E-01

    A 3.0 MW lithium-ion battery backup that keeps your compute online in the gap between utility interruption and generator response.

  • 04
    Power Skid
    E-02

    3.6 MVA transformers paired with 5,000A low-voltage switchboards that step down and distribute voltage to the site.

  • 05
    Diesel Generator Module
    DG-01

    3.3MW diesel generator providing 24-hour backup power when utility power fails. Includes Belly tank, radiator & enclosure.

  • 06
    4N/3 Electrical Glue
    G-03

    Proprietary 5000A electrical interconnects that connect & distribute power between each module in the system.

  • 07
    Cooling Glue
    G-06

    Pre-engineered mechanical piping modules that connects the chiller loop to each GigaPod, delivering cooled water to the system.

  • 08
    Air-cooled Chiller
    M-02

    2MW Maglev compressor chiller that rejects system heat and feeds a closed cooling water loop to each GigaPod.

Timeline

Energize in half the time

Site construction and module manufacturing happen in parallel, not sequentially. Competitors move the same work through a waterfall of vendors, adding months at every handoff.

FASTER TIME TO POWER

> 6 months saved

Energize in just 9 months vs. 18+ month industry avg.

Construction

Our 9-month build process

MO. 0-2

Site Design

Giga’s engineering and design team plans your site around your specific compute, cooling, and density requirements.

Mo. 1–6

Site Development & Manufacturing

Giga manages utility interconnection, ground prep, and building construction, all while your modules are built and tested in our factories.

Mo. 6–9

Modules Placed On-Site

Giga manufactures, tests, and commissions your data center infrastructure. Modules arrive ready to connect, reducing field labor by 10x.

Mo. 9

Energization

Modules arrive pre-tested and ready to go. Power flows, cooling connects, and your site is rack-ready in 9 months.

Why Giga

Compressing the stack

10 vendor hand-offs mean 10 places your project can stall. We eliminate those gaps and protect your timeline.

Traditional Approach

Multiple vendors
  • 01
    Site selection + real estate
  • 02
    Legal counsel
  • 03
    Land counsel
  • 04
    Permitting consultants
  • 05
    Owner's rep / project manager
  • 06
    General contractor
  • 07
    EPC firm
  • 08
    Engineering firms (MEP/structural)
  • 09
    Utility coordination
  • 10
    Manufacturers + procurement
  • 3rd-party commissioning
  • Subcontractor

Giga Energy

One reliable partner
  • Everything from site selection to energization in a single relationship
  • 3rd-party commissioning
  • Subcontractor

Full-stack

One partner. Every phase.

Most data centers are assembled from a chain of 12+ separate companies. Giga owns the entire value chain — origination, manufacturing, development, operations — under one roof.

01 / Land & Power

Powered Land

A large and growing portfolio of powered sites. Low-cost power markets. Lots of acreage. Strategic locations. Fiber access. High-voltage infrastructure available.

See Powered Land
02 / Equipment
AI Infrastructure
02 / Equipment

AI Infrastructure

We manufacture all the infrastructure between the utility and the rack — transformers, switchboards, and power and cooling modules.

See AI Infrastructure
03 / Construction
Site Development
03 / Construction

Site Development

We build build-to-suit data centers using our own infrastructure or on behalf of customers — on their land or ours. Flexible deal structures. Faster, cheaper, and more cost-certain than the multi-vendor norm.

See Construction & Development
04 / Operations
Colocation
04 / Operations

Colocation

We offer colocation data centers on our own powered land. Purpose-built for high-density GPU deployments and operated by the same team that built them.

See Colocation

vs competitors

What makes Giga better for AI development?

  • Speed

    We deploy in under 9 months.


    Others: 14-18 months or longer

  • Who builds it

    We manufacture everything, from white space compute to power.

    Others coordinate vendors.

  • true Pre-fab

    We build in the factory instead of the field.

    Others start construction on site, behind schedule.

  • Single vendor

    Our integration = Fewer handoffs.

    Others = More to manage.

Talk to Sales

Build with us

Share a few details and our AI infrastructure team will follow up within one business day. If you're close to Alameda, CA, ask about a tour of our Innovation Hub.