Giga Power Systems
Market-Optimized Demand Response for Flexible Load Data Centers
A purpose-built demand response and market participation platform that turns curtailable compute from flexible load data centers and bitcoin mining operations into predictable revenue, grid value, and lower net energy costs.

Monetize your downtime with Giga Power Systems

Enroll and monetize flexible load (demand response, ancillary services, day-ahead markets) with a turnkey market participation program.
Hands-on, daily site-level optimization that balances revenue against uptime SLAs and site economics.
Full-service offering — enrollment, telemetry, and operations — paired with hardware procurement benefits for contracted sites.
Market participation by operators, for operators
Giga Power Systems combines Giga’s hardware capabilities with a market-grade operations stack to make direct market participation simple and profitable.



For Bitcoin mining operations
When the grid values your megawatt hours more than the bitcoin network does, Giga Power Systems enables you to profit through curtailment.

For flexible load data centers
Traditional demand response systems don’t work for flexible loads. Giga Power Systems is different because it's specifically designed by operators, for operators.

How does Giga Power Systems work?
Giga Power Systems is built by operators, for operators. We run flexible-load sites ourselves and operate over 175 MW across the U.S, with another 500MW in development — and we do it using equipment we manufacture ourselves.


24/7 transparency and control
Dynamic market participation for maximum profit




Enterprise-grade tooling built for growth
What we deliver for flexible load data centers
Real market revenue
GPS enables participation in demand response, ancillary services, and day-ahead energy markets to create new, recurring revenue streams — up to $80k per MW per year in SPP.
Faster payouts
Get payouts twice as fast as traditional demand response tools.
Transparent, self-serve software tooling
Everything you need to know about your market participation, all in one place.

Full-market participation
Enroll sites into demand response, ancillary markets, and day-ahead energy programs.
Daily, site-level optimization
Decisions driven by real prices, SLAs and breakeven math — not static rules.
Fleet aggregation & compliance
Aggregate control and reporting across assets for scalable market enrollment and auditable performance.
Telemetry & secure control
Turnkey telemetry, metering and remote control to meet market telemetry and verification needs.
Commercial & hardware packaging
Optimization contracts that include procurement advantages on Giga transformers, switchboards and site equipment.
Operator-centric playbook
Platform and services designed by teams with deep mining and high-density compute operating experience.
Why partner with Giga Power Systems
Giga Power Systems makes direct market participation simple and profitable. GPS is a single partner for enrollment, telemetry, dispatch, and compliance, engineered specifically for the economics of high-density compute.
Built for flexible compute
GPS factors in site-level economics (uptime SLAs, breakeven thresholds) rather than a one-size-fits-all aggregator model.
Hands-on optimization
Daily decision-making that positions sites for the most profitable hours while protecting uptime.
Hardware + commercial advantages
Customers on multi-year GPS contracts are eligible for hardware CAPEX advantages from Giga Energy, simplifying procurement and lowering total cost of ownership.
Proven operating playbook
GPS builds on operational experience from Giga’s own operating portfolio and pipeline.
FAQs
Find answers to frequently asked questions about our site origination and development services.
How long does enrollment take?
Enrollment and technical integration timelines vary by market and interconnection of telemetry, but GPS manages enrollment, telemetry and dispatch to get sites earning as quickly as programs allow.
Can I buy hardware from Giga Energy?
Yes — GPS pairs market services with Giga equipment. Customers on multi-year optimization contracts receive hardware procurement advantages.
What’s the minimum project size?
GPS targets multi-megawatt compute sites. We commonly work with sites above ~10 MW of flexible capacity but evaluate projects on a case-by-case basis.
Unsure? Reach out to our team
How do you protect uptime and site economics?
Our optimization uses site-level economics, SLA constraints, and breakeven thresholds to ensure participation never undermines uptime or core business requirements.
How do you participate in markets today?
GPS offers full in-house participation for customers on SPP. The platform supports demand response, ancillary services and day-ahead markets.