AI data centers

AI data center construction, manufacturing, and colocation

175+ MW
energized
500+ MW
in pipeline
9-month
deployment

AI data centers built in 9 months. Giga manufactures infrastructure, develops sites, and operates facilities, helping you bring AI compute online faster.

Build with one integrated partner

Giga owns everything, from manufacturing to deployment. That means one partner you can trust to get your AI data centers online, on time.

See gigabase

Traditional Approach

Multiple vendors
  • 01
    Site selection + real estate
  • 02
    Legal counsel
  • 03
    Land counsel
  • 04
    Permitting consultants
  • 05
    Owner's rep / project manager
  • 06
    General contractor
  • 07
    EPC firm
  • 08
    Engineering firms (MEP/structural)
  • 09
    Utility coordination
  • 10
    Manufacturers + procurement
  • 3rd-party commissioning
  • Subcontractor

Giga Energy

One reliable partner
  • Everything from site selection to energization in a single relationship
  • 3rd-party commissioning
  • Subcontractor

AI infrastructure without the wait

We manufacture every module in-house, from transformers and switchboards to generators and cooling, so your equipment is ready before you need it.

In-house manufacturing reduces procurement risk. Because we manufacture in-house, your equipment is in production while your site is being prepared, not ordered after the fact.

AI infrastructure
A drone photo of a Giga Energy AI factory
Parallel construction compresses the schedule. By the time your site is ready, your equipment arrives pre-built, pre-tested, and ready to connect.
Designed for AI density from the start. Our infrastructure is designed specifically for the higher power density that modern xPU workloads demand.

Looking for available megawatts?
Giga has the powered land.

Powered sites available now

Every site in our portfolio has committed or actively negotiated MW capacity, not just proximity to a substation.

Explore powered land

Built-in utility coordination

We work directly with utilities from the start, securing interconnection, managing timelines, and moving capacity agreements forward before your project needs them.

Built-in utility coordination

Sites across markets where power is most competitive

Our portfolio spans ERCOT, SPP, MISO, and PJM, giving you access to markets with available capacity and favorable power economics.

talk to our team about availability
inside an AI data center from Giga Energy
a man working on the Giga Energy factory yard
a sunrise at a Giga Energy data center

Built for speed 
at every step

Giga works with xPU cloud providers, hyperscalers, and data center developers who need a faster, simpler path to energized capacity.

talk to our team about your deployment

Talk to Sales

Build with us